Baylah Posted September 10, 2005 Posted September 10, 2005 Can someone please look at this FMP6 file and help me out. I am doing this in FMP 6 because I need to run it through developer 5.5 as I don'thave the upgrade to developer 7 and when I finsih this I need to be able to distribute run time soultion. If you goto the second layout and then sort by Operator then enter preview mode and look under the column for aveverage pieces per machine hour, in the first row I get a return of 28 (expected) on the second line I get a return of 0 (zero) I do not understand why this is not displaying the right number which should be appx. 12 (maybe 13) This is freaking me out, I have never experienced this before. I know I must be missing something simple, but I can't figure it out. Steve Op_Perf.zip
Baylah Posted September 10, 2005 Author Posted September 10, 2005 Never Mind....I figured it out.....Sometimes you just have to step back from it...and think! Thanks anyway Steve
Recommended Posts
This topic is 7112 days old. Please don't post here. Open a new topic instead.
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now