Jump to content
View in the app

A better way to browse. Learn more.

FMForums.com

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

need advice of estimating program structure

Featured Replies

Hi all

I would like for advice on the structure of an estimating program we are starting to work on. I have the basic written down and included a PDF of what is will look like.

The first layout has about forty or more fields with about 2/3 of the fileds being unique to that particular item wich would be the main component.

The second filds has a bout thrity fileds. These two layout have only about 5 or 6 fields in common.

The question is, Would your use one table too house all the records although many fields would not be completed per record for a component.

example

a separate table for LWN

a separate table for WN Flanges

a separate table for Steel Plate

a separate table Misc information

but all these tables would have one record or more records for each component.

thanks in advance

Lionel

estpdf.pdf

Create an account or sign in to comment

Important Information

By using this site, you agree to our Terms of Use.

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.