April 6, 201114 yr Hi all, I have a question where I can't seem to find a proper solution. I have my fields: product item, quantity quoted, quantity worked. Now these product items can be selected by the employee on a per project basis. This works fine, however where there are multiple of the same product item and I link it to the selected item number, the quantity quoted will be correct, but the quantity worked will be the same number per line item. I hope this is not to confusing. So what I want to do is the following: - if a product item already exists in the portal (duplicate of the same item within that project), I would like to display the sum of the quantity. So instead of displaying: Item 10.0.4.5 - quantity : 4 Item 10.0.4.5 - quantity : 5 It should display: Item 10.0.4.5 - quantity : 9
Create an account or sign in to comment